


Created a 3rd bedroom by moving a wall. Reallocated attic space to create a functional loft featuring a large picture window.
Removed two walls to create a great room and installed large plank flooring in the living room and dining room. Refinished the basement, put in a bar, and installed a new 1/2 bath.
Took out a wall between kitchen and living room. Currently the fireplace is part of the dining room. Finished basement, added a bar and home theatre.
Installed a dormer above the second floor landing, extending the ceiling height by 15ft and added a huge picture window and a loft. Raised ceiling inside enclosed porch with designer fan. Gas wall fireplace in living room.
A pre-priced, timeline-driven execution system where contractors opt into clearly defined jobs with strict deadlines and costs set by you.
This proven system avoids:
Cost overruns
Contractor chaos
Timeline delays
Huge Punch lists
Most flippers fail in the execution phase.
A contractor disappear mid-job
Your rehab budget creep up week after week
A long punch list at the end of your flip
A project that runs over schedule

It's Ur Flip Β· All Rights Reserved Β· Privacy Β· Terms and Conditions